Time and cost per step
Help centre › Analysis and standards
Give steps a Duration (hands-on time, e.g. 15m, 2h, 1d = 8 hours), a Wait before it and a Cost per run, under Performance in Details, or straight in the Time and cost panel.
View > Analysis > Time and cost colours each step by its time (red takes the most) and shows:
- the happy path (the main route through each decision), the longest path and the shortest path, each with elapsed time, hands-on time, waiting time and cost;
- how much of the elapsed time is hands-on, and which steps have no duration yet;
- what-ifs: out takes a step out, ½ wait halves its wait, and the totals update. What-ifs aren’t saved.